Bce drena previsti 188 miliardi in operazione sterilizzazione fondi

martedì 8 ottobre 2013 13:01
 

FRANKFURT, Oct 8 (Reuters) - The European Central Bank announced the  
following results for its latest liquidity absorbing operation: 
 
 Tender Operation-Allotment                  Intended Volume:                   
 Reference Number: 20130224                  Min Allotment:                     
 Transaction Type: Fixed Term Deposits       Max Rate: 0.50 %                   
 Operation Type: Liquidity Absorbing         Max Bid Limit:                     
 Procedure: Quick Tender                     Max Bids per Cpty: 4               
 Tender Date: 08/10/2013 12:55               Marg. Rate: 0.09 %                 
 Start Date: 09/10/2013                      % of All. at Marg. Rate: 72.9864   
 Maturity Date: 16/10/2013                   Tot Amount Allotted: 188000 mn     
 Duration (days): 7                          Weight. Avg. Allot. Rate: 0.08 %   
                                             Tot Bid Amount: 251347.3 mn        
 Auction Type: Variable Rate Tender          Tot Number of Bidders: 117         
 Allotment Method: Multiple Rate             Min Rate (bids): 0.00 %            
                                             Max Rate (bids): 0.50 %